Site Construction Photo Gallery - Site Tour 11
During construction: June through September 2006.


During construction: June through September 2006.
During construction: June through September 2006.
During construction: June through September 2006. Administration buildings.
During construction: June through September 2006. Aera MTA auger
During construction: June through September 2006. Aera tran site line.
During construction: June through September 2006. Aera tran site line.
During construction: June through September 2006.
During construction: June through September 2006.
During construction: June through September 2006. California least tern nest.
During construction: June through September 2006. Dredge discharge.
During construction: June through September 2006. Dredging in the Full Tidal Basin.
During construction: July aerial photo.
During construction: June through September 2006. The inlet dam in the Full Tidal basin.
During construction: June through September 2006. The inlet dam to the ocean
During construction: June through September 2006. Dredger removal.
During construction: June through September 2006. East water control station leak.
During construction: June through September 2006. Overlooking the east slope.
During construction: June through September 2006. The Full Tidal Basin.
During construction: June through September 2006. The inlet belvedre.
During construction: June through September 2006. Inlet.
During construction: June through September 2006. Inlet OSB.
During construction: June through September 2006. The inlet under the Pacific Coast Highway.
During construction: June through September 2006.
During construction: June through September 2006. Levee toe damage.
During construction: June through September 2006.
During construction: June through September 2006. Inlet.
During construction: June through September 2006. Inlet.
During construction: June through September 2006. Inlet.
During construction: June through September 2006. New pipe.
During construction: June through September 2006. Park fence after construction.
During construction: June through September 2006. Park fence before construction.
During construction: June through September 2006. Pacific Coast Highway bridge.
During construction: June through September 2006. Pacific Coast Highway dredge pipe removal.
During construction: June through September 2006. Pacific Coast Highway MSE wall.
During construction: June through September 2006. Pacific Coast Highway railing end.
During construction: June through September 2006. Pocket Marsh channel cut.
During construction: June through September 2006. Pocket Marsh channel cut.
During construction: June through September 2006. Pocket Marsh culvert east headwall.
During construction: June through September 2006. Pocket Marsh culvert east headwall.
During construction: June through September 2006. Pocket Marsh culvert arrival.
During construction: June through September 2006. Pocket Marsh culvert lift.
During construction: June through September 2006. Pocket Marsh culvert lift.
During construction: June through September 2006. Pocket Marsh culvert trench.
During construction: June through September 2006. Pocket Marsh culvert west headwall.
During construction: June through September 2006. Pocket Marsh culvert work area.
During construction: June through September 2006. Pocket Marsh culvert west wall.
During construction: June through September 2006. Pocket Marsh.
During construction: June through September 2006. Pocket Marsh east headwall.
During construction: June through September 2006. A flooded Pocket Marsh.
During construction: June through September 2006. Pocket Marsh north end flooded.
During construction: June through September 2006. Pocket Marsh.
During construction: June through September 2006. Pocket Marsh opening.
During construction: June through September 2006. Pocket Marsh opening.
During construction: June through September 2006. Pocket Marsh opening.
During construction: June through September 2006. Pocket Marsh opening.
During construction: June through September 2006. Pocket Marsh road raised.
During construction: June through September 2006. Pocket Marsh staging.
During construction: June through September 2006. Pocket Marsh staging area.
During construction: June through September 2006. Pocket Marsh west dam removed.
During construction: June through September 2006. Pocket Marsh west headwall.
During construction: June through September 2006. Pocket Marsh west headwall culverts.
During construction: June through September 2006.
During construction: June through September 2006. Staircase being rebuilt.
During construction: June through September 2006. Equipment stuck in Pocket Marsh.
During construction: June through September 2006. Equipment stuck in Pocket Marsh.
During construction: June through September 2006. Tidal section.
During construction: June through September 2006. West water control structure gate leak.
During construction: June through September 2006. Open inlet.
During construction: June through September 2006. Open inlet.
During construction: June through September 2006. Pacific Coast Highway Bridge with the inlet open.
During construction: June through September 2006. Aerial photo.
During construction: June 2006. Aerial photo.
During construction: June 2006. Aerial photo.
During construction: July 2006. Aerial photo.
During construction: July 2006. Aerial photo.
During construction: July 2006. Aerial photo.
During construction: July 2006. Aerial photo.
During construction: July 2006. Aerial photo.
During construction: July 2006. Aerial photo.
-