Loading image. Please wait

During construction: Aerial photo November 2005. 

During construction: Aerial photo November 2005. 

During construction: November through December 2005.  Bidwell Pacific Coast Highway bridge.

During construction: November through December 2005.  Boardwalk repair.

During construction: November through December 2005.  Boardwalk repair.

During construction: November through December 2005.  Cordgrass shelf.

During construction: November through December 2005.  Groundwater barrier discharge line.

During construction: November through December 2005.  Groundwater barrier header pipes.

During construction: November through December 2005.  Groundwater barrier sheet piles in place.

During construction: November through December 2005.  Levee finish grade.

During construction: November through December 2005.  Levee wattle.

During construction: November through December 2005.  Mid-culvert sluice gates.

During construction: November through December 2005.  Muted tidal channel.

During construction: November through December 2005.  Muted tidal channel.

During construction: November through December 2005.  Muted tidal channel.

During construction: November through December 2005.  Muted tidal channel.

During construction: November through December 2005.  Muted tidal channel.

During construction: November through December 2005.  Muted tidal oil wells.

During construction: November through December 2005.  Muted tidal road culverts.

During construction: November through December 2005.  Muted tidal road cut.

During construction: November through December 2005.  Oil delineation.

During construction: November through December 2005.  Oil delineation.

During construction: November through December 2005.  Oil tank truck.

During construction: November through December 2005. Oil well berm.

During construction: November through December 2005.  Oil well head-berm.

During construction: November through December 2005.  Oil well monitoring marker.

During construction: November through December 2005.  Oil work over rig.

During construction: November through December 2005. Orange ditch.

During construction: November through December 2005. OSB pile cutoff.

During construction: November through December 2005. West overlook.

During construction: November through December 2005.  Pacific Coast Highway paving.

During construction: November through December 2005.  Pacific Coast Highway paving.

During construction: November through December 2005.  Pacific Coast Highway paving.

During construction: November through December 2005.  A mixture of shorebirds on the road.

During construction: November through December 2005.  A pit in cell 21.

During construction: November through December 2005.  Wattle staked.

During construction: November through December 2005.  West culvert.

During construction: November through December 2005.  East levee edge.

During construction: November through December 2005. West overlook.

© 2009 Bolsa Chica Lowlands Restoration Project. All rights reserved.
San Diego Website Design by: Dog and Rooster, Inc.