Loading image. Please wait

During construction: Aerial photo September 2005.

During construction: Aerial photo September 2005.

During construction: Aerial photo September 2005.

During construction: Aerial photo September 2005. 

During construction: Aerial photo September 2005.

During construction: Aerial photo September 2005.

During construction: September through October 2005.  Aera cutting pipe.

During construction: September through October 2005. Aera pipes over the water.

During construction: September through October 2005. Aera pipes over the water.

During construction: September through October 2005. Beach revetment burial.

During construction: September through October 2005. Beach revetment burial.

During construction: September through October 2005. 

During construction: September through October 2005. Pelicans resting on boom.

During construction: September through October 2005. Pelicans resting on boom

During construction: September through October 2005. Boardwalk demolition.

During construction: September through October 2005. Boardwalk demolition.

During construction: September through October 2005. Repaired boardwalk.

During construction: September through October 2005. Bridge abutment form.

During construction: September through October 2005. Cell 10.

During construction: September through October 2005. Cell 2.

During construction: September through October 2005.

During construction: September through October 2005.  Dredging Ross Island

During construction: September through October 2005. Dredging.

During construction: September through October 2005. Dredge barge.

During construction: September through October 2005. Dredge floats

During construction: September through October 2005. The dredge pipe on the beach..

During construction: September through October 2005. Dredge ramp.

During construction: September through October 2005. Dredge ramp.

During construction: September through October 2005. East culvert head wall.

During construction: September through October 2005. East culvert outlet channel.

During construction: September through October 2005. East overlook access.

During construction: September through October 2005. 

During construction: September through October 2005. Freeman Creek box lift.

During construction: September through October 2005. Full Tidal Basin filling.

During construction: September through October 2005. Full Tidal Basin filling.

During construction: September through October 2005.  Full Tidal Basin rock levee.

During construction: September through October 2005. Groundwater well access road .

During construction: September through October 2005.  Groundwater barrier pile driver.

During construction: September through October 2005.  The groundwater electrial post at the end of Talbert Ave.

During construction: September through October 2005.  Inlet rock work.

During construction: September through October 2005.  Inlet rock work.

During construction: September through October 2005.  Intake flow.

During construction: September through October 2005.

During construction: September through October 2005.

During construction: September through October 2005.  Intake outlet.

During construction: September through October 2005.  Intake valves.

During construction: September through October 2005.  Laser level.

During construction: September through October 2005.  The levee along Rabbit Island.

During construction: September through October 2005.  Loop trail elbow.

During construction: September through October 2005.  Mid-culvert box.

During construction: September through October 2005.  Mid-culvert boxes.

During construction: September through October 2005.  Mid-culvert boxes.

During construction: September through October 2005.  Mid-culvert gates.

During construction: September through October 2005.  Mid-culvert inside.

During construction: September through October 2005.  Mid-culvert inside.

During construction: September through October 2005.  PCB cleanup.

During construction: September through October 2005.  PCB cleanup.

During construction: September through October 2005.  PCB removal.

During construction: September through October 2005.  PCB removal.

During construction: September through October 2005.  Pacific Coast Highway abutment form.

During construction: September through October 2005.  Pacific Coast Highway bridge piles.

During construction: September through October 2005.  Pacific Coast Highway bridge work.

During construction: September through October 2005.  Pacific Coast Highway deck forms.

During construction: September through October 2005.  Pacific Coast Highway drain.

During construction: September through October 2005.  Pacific Coast Highway MSE wall.

During construction: September through October 2005.  Pacific Coast Highway MSE wall.

During construction: September through October 2005.  Pacific Coast Highway pile inspection.

During construction: September through October 2005.  Pacific Coast Highway piles detour.

During construction: September through October 2005.  Pacific Coast Highway piles detour.

During construction: September through October 2005.  American White pelicans and Brown pelicans.

During construction: September through October 2005.  American White pelicans and Brown pelicans.

During construction: September through October 2005.  Pile auger.

During construction: September through October 2005.  Pile auger.

During construction: September through October 2005.  Pile prep.

During construction: September through October 2005.  Piling cutoff.

During construction: September through October 2005.  Piling cutoff.

During construction: September through October 2005.  Pilings.

During construction: September through October 2005.  Pilings.

During construction: September through October 2005.  Poles that are to be moved.

During construction: September through October 2005.  Road in Bolsa Chica after rain.

During construction: September through October 2005.  Revetment hole.

During construction: September through October 2005.  Revetment hole.

During construction: September through October 2005.  Rock toe.

During construction: September through October 2005.  Driven sheet pile.

During construction: September through October 2005. Sheet pile driver.

During construction: September through October 2005.  Sheet pile driver.

During construction: September through October 2005.  STI new sand.

During construction: September through October 2005.  Switch gear building.

During construction: September through October 2005.  Trespassers.

During construction: September through October 2005.  Whipstock alley.

During construction: September through October 2005. 

During construction: November through December 2005.  Dredge cutterhead.

During construction: November through December 2005. Freeman Creek outlet channel.

During construction: September through October 2005. East culvert boxes.

During construction: September through October 2005.  Groundwater barier trench at the north end.

During construction: September through October 2005.  Groundwater barrier trench at the south end.

During construction: September through October 2005.  The north end after removal of the temporary dike.

During construction: September through October 2005.  The south end after removal of the temporary dike.

During construction: September through October 2005.  The view from the east overlook.

© 2009 Bolsa Chica Lowlands Restoration Project. All rights reserved.
San Diego Website Design by: Dog and Rooster, Inc.