Site Construction Photo Gallery - Site Tour 6
During construction: Aerial photo July 2005.


During construction: Aerial photo July 2005.
During construction: Aerial photo July 2005.
During construction: Aerial photo August 2005.
During construction: Aerial photo August 2005.
During construction: July through August 2005. Air test device.
During construction: July through August 2005. Wall of building 5.
During construction: July through August 2005. The wall rebar for building 5.
During construction: July through August 2005. Equipment being repaired.
During construction: July through August 2005. Contaminated power pole.
During construction: July through August 2005. A pile of debris.
During construction: July through August 2005. Dredging pipe.
During construction: July through August 2005. East culvert forms.
During construction: July through August 2005. East culvert outlet channel.
During construction: July through August 2005. East culvert wall.
During construction: July through August 2005. Freeman Creek culvert dig.
During construction: July through August 2005. Freeman Creek culvert form.
During construction: July through August 2005. Freeman Creek outlet channel.
During construction: July through August 2005. Freeman Creek wall.
During construction: July through August 2005. Freeman Creek culvert excavation.
During construction: July through August 2005. Freeman Creek culvert forms.
During construction: July through August 2005. Groundwater barrier sheet pile.
During construction: July through August 2005. Groundwater pile joints.
During construction: July through August 2005. Iceplant before removal.
During construction: July through August 2005. Iceplant removal.
During construction: July through August 2005. Iceplant after removal
During construction: July through August 2005. Iceplant removal.
During construction: July through August 2005. Iceplant after removal.
During construction: July through August 2005. Iceplant removal.
During construction: July through August 2005. Jetty stone.
During construction: July through August 2005. Jetty stone pile.
During construction: July through August 2005. Levee compaction.
During construction: July through August 2005. Levee rock.
During construction: July through August 2005. Levee shaping.
During construction: July through August 2005. Nest site 2.
During construction: July through August 2005. Nest site 2 capping.
During construction: July through August 2005. Non-native vegetation removal.
During construction: July through August 2005. Oil well.
During construction: July through August 2005. PCB site before cleanup.
During construction: July through August 2005. PCB excavation.
During construction: July through August 2005. PCB removal.
During construction: July through August 2005. Pile cuts.
During construction: July through August 2005. Pile driving.
During construction: July through August 2005. Pile cuts.
During construction: July through August 2005. Pilings.
During construction: July through August 2005. Pilings.
During construction: July through August 2005. Piling cuts.
During construction: July through August 2005. Power line trench.
During construction: July through August 2005. Building 5 retaining wall.
During construction: July through August 2005. Riprap along levee.
During construction: July through August 2005. Rock moving.
During construction: July through August 2005. Rock placing
During construction: July through August 2005. Rock placing.
During construction: July through August 2005. Rock placing.
During construction: July through August 2005. Rock prep.
During construction: July through August 2005. Tank truck on dike.
During construction: July through August 2005. Removal of the South temporary dike.
During construction: July through August 2005. The South temporary dike.
During construction: July through August 2005. North temporary dike removal.
During construction: July through August 2005. West culvert wall form.
During construction: July through August 2005. West culvert form.
During construction: July through August 2005. West culvert form.
During construction: July through August 2005. North temporary dike.
-
Visit Bolsa Chica
Coming soon... deta.... Click here
Questions? -
Latest News
Least tern and snowy plover nesting u...
San Diego Website Design by: Dog and Rooster, Inc.