Loading image. Please wait

During construction:  Aerial photo July 2005.

During construction:  Aerial photo July 2005.

During construction:  Aerial photo July 2005.

During construction:  Aerial photo August 2005.

During construction:  Aerial photo August 2005.

During construction:  July through August 2005.  Air test device.

During construction:  July through August 2005. Wall of building 5.

During construction: July through August 2005.  The wall rebar for building 5.

During construction: July through August 2005.  Equipment being repaired.

During construction: July through August 2005.  Contaminated power pole.

During construction: July through August 2005.  A pile of debris.

During construction: July through August 2005.  Dredging pipe.

During construction: July through August 2005.  East culvert forms.

During construction: July through August 2005.  East culvert outlet channel.

During construction: July through August 2005.  East culvert wall.

During construction: July through August 2005.  Freeman Creek culvert dig.

During construction:  July through August 2005.  Freeman Creek culvert form.

During construction:  July through August 2005.  Freeman Creek outlet channel.

During construction:  July through August 2005.  Freeman Creek wall.

During construction:  July through August 2005.  Freeman Creek culvert excavation.

During construction:  July through August 2005.  Freeman Creek culvert forms.

During construction:  July through August 2005.  Groundwater barrier sheet pile.

During construction:  July through August 2005.  Groundwater pile joints.

During construction:  July through August 2005.  Iceplant before removal.

During construction:  July through August 2005.  Iceplant removal.

During construction:  July through August 2005.  Iceplant after removal

During construction:  July through August 2005.  Iceplant removal.

During construction:  July through August 2005.  Iceplant after removal.

During construction:  July through August 2005.  Iceplant removal.

During construction:  July through August 2005.  Jetty stone.

During construction:  July through August 2005.  Jetty stone pile.

During construction:  July through August 2005.  Levee compaction.

During construction:  July through August 2005.  Levee rock.

During construction:  July through August 2005.  Levee shaping.

During construction:  July through August 2005.  Nest site 2.

During construction:  July through August 2005.  Nest site 2 capping.

During construction:  July through August 2005.  Non-native vegetation removal.

During construction:  July through August 2005.  Oil well.

During construction:  July through August 2005.  PCB site before cleanup.

During construction:  July through August 2005.  PCB excavation.

During construction:  July through August 2005.  PCB removal.

During construction:  July through August 2005.  Pile cuts.

During construction:  July through August 2005.  Pile driving.

During construction:  July through August 2005.  Pile cuts.

During construction:  July through August 2005.  Pilings.

During construction:  July through August 2005.  Pilings.

During construction:  July through August 2005.  Piling cuts.

During construction:  July through August 2005.  Power line trench.

During construction:  July through August 2005.  Building 5 retaining wall.

During construction:  July through August 2005.  Riprap along levee.

During construction:  July through August 2005.  Rock moving.

During construction:  July through August 2005.  Rock placing

During construction:  July through August 2005.  Rock placing.

During construction:  July through August 2005.  Rock placing.

During construction:  July through August 2005.  Rock prep.

During construction:  July through August 2005.  Tank truck on dike.

During construction:  July through August 2005.  Removal of the South temporary dike.

During construction:  July through August 2005.  The South temporary dike.

During construction:  July through August 2005.  North temporary dike removal.

During construction:  July through August 2005.  West culvert wall form.

During construction:  July through August 2005.  West culvert form.

During construction:  July through August 2005.  West culvert form.

During construction:  July through August 2005.  North temporary dike.

© 2009 Bolsa Chica Lowlands Restoration Project. All rights reserved.
San Diego Website Design by: Dog and Rooster, Inc.