During construction: May through June 2005.  Pile of rock for construction of jetties.

During construction: May through June 2005.  Removal of ice plant.

During construction: May through June 2005.  Levee rock.

During cosntruction: May through June 2005.  Levee rock.

During cosntruction: May through June 2005.  Levee rock.

During cosntruction: May through June 2005. Side of levee.

During cosntruction: May through June 2005. Side of levee.

During cosntruction: May through June 2005. Side of levee.

During construction: May through June 2005.  Loading water.

During construction: May through June 2005.  The top of nesting site.

During construction: May through June 2005.  Removal of non-native vegetation.

During construction: May through June 2005.  Capping of nesting site.

During construction: May through June 2005.  Old culvert cuts.

During construction: May through June 2005.  Over-excavated cleanup.

During construction: May through June 2005.  Pickleweed and algal mat.

During construction: May through June 2005.  Pile driver.

During construction: May through June 2005. Pile driving.

During construction: May through June 2005.  Piling downhill.

During construction: May through June 2005.  Powerline trench.

During construction: May through June 2005.  Rock inspectors.

During construction: May through June 2005.  Rock on levee.

During construction: May through June 2005.  Rock on levee.

During construction: May through June 2005.  Smoothing of levee.

During construction: May through June 2005.  Improving the soil surrounding building five.

During construction: May through June 2005.  Test pit.

During construction: May through June 2005.  Truck leaving pit.

During construction: May through June 2005.  Western levee.